Foundation - Started January 4, 2010 ![]() Construction of this spectacular raised Dunes West luxury home has started with the digging of the footings on January 4,2010. Under code, the footings must be a minimum of 20 inches from "finished grade." With proper planning, a good builder, subcontractors and weather permitting, this home should be completed in about 6 months. ![]() A YouTube HD Video Of The Digging Of The Footings In January Of 2010 The Placement Of Rebar In Footings Prior To Pouring Of Concrete ![]() Footings filled with concrete on January 6, 2010 ![]() ![]() The poured concrete will need 2 days to cure before the concrete block is laid. ![]() January 9, 2010 - The laying of the concrete block has started. ![]() ![]() January 11, 2010 Progress Below Photo Below Taken January 13, 2010 Shows Stage Of Construction. The Cinder-blocks Will Be Filled With Concrete In Two stages When the "Cells" Are Built 1/2 Of The Way Up To The First Floor & At The Top As To Insure That There Are No Air Pockets Left In The Cells At Completion. This Two Step Process Is More Expensive Than Filling The Blocks At The Completion Of Laying Them, But Insuring The Consistency Of The Concrete Inside The Cells Is Well Worth The Added Expense. Progress Mid Day January 16, 2010 ![]() Stage Of Construction On January 20, 2010 ![]() Top 50% Of Block Cells Filled With Concrete. ![]() Steel For Second Floor Support Delivered To Job Site On January 25, 2010 & Put In Place On January 26, 2010. ![]() The Steel Support System Is Necessary Because The New Home Owners Have Designed Their New Home With A Smaller Second Floor Footprint Than The First Necessitating Steel Columns To Support The Load Bearing Walls. ![]() The Bottom Support Bolts Are Driven About 10 Inches Into The Concrete. ![]() A Wooden Strip Is Placed At The Bottom Of The Foundation where The Concrete Will Be Poured And Removed To Insure The Presence Of An Expansion Joint.
Interior Of Home
Agent Owned Realty 824 Johnnie Dodds Blvd. Mount Pleasant, SC 29464 |